It has been suggested that this article be merged with Expressway S2 (Poland). (Discuss) Proposed since January 2025. |
Overview | |
---|---|
Official name | Tunel drogi ekspresowej S2 w Warszawie |
Location | Warsaw, Masovian Voivodeship, Poland |
Coordinates | 52°08′43″N 21°03′06″E / 52.14528°N 21.05167°E |
Status | Completed |
Route | S 2 |
Start | Węzeł Ursynów Zachód, Warsaw |
End | Węzeł Ursynów Wschód, Warsaw |
Operation | |
Work begun | 1 March 2017 |
Opened | 20 December 2021 |
Operator | GDDKiA |
Traffic | car, minibus, van |
Character | Underground |
Toll | no |
Technical | |
Length | 2.33 km (1.45 mi) or 2.335 km (1.451 mi) |
No. of lanes | 6 |
Operating speed | 80 kilometres per hour (50 mph) |
The Expressway S2 Tunnel in Warsaw (Polish: Tunel drogi ekspresowej S2 w Warszawie) or Ursynów Tunnel (Polish: Tunel pod Ursynowem) is a highway tunnel, part of the S2 expressway in Warsaw.[1]
The tunnel began construction on 1 March 2017 and opened on 20 December 2021[2]. The contractor was Astaldi SpA.[3]
As of 2025, the tunnel is the longest road tunnel in Poland.[4] From the west, the tunnel entry begins at Węzeł Ursynów Zachód junction. In the east, the tunnel joins the Węzeł Ursynów Wschód junction.