Overview | |
---|---|
Location | Albania |
Coordinates | 40°12′29″N 19°34′10″E / 40.20806°N 19.56944°E |
Status | In use |
Route | SH8 |
Start | Dukat (north) |
End | Palasë (south) |
Operation | |
Work begun | 14 November 2021 |
Opened | 5 July 2024 |
Owner | Republic Of Albania |
Operator | Albanian Road Authority |
Traffic | Automotive |
Toll | none (planned to start in 2025) |
Technical | |
Length | 5.9 kilometres (5,900 m) |
No. of lanes | 2 |
Operating speed | 80 km/h (50 mph) |
Highest elevation | 1,000 m (3,300 ft) |
Lowest elevation | 400 m (1,300 ft) |
The Llogara Tunnel is a tunnel located in the south of Albania about 20 km from Vlora.[1] The tunnel that cuts through the Llogara National Park, has a length of 6 kilometers and is the longest in the country. It is expected to significantly improve travel times between the Albanian Riviera and other parts of the country.[2]