This article needs additional citations for verification. (December 2020) |
![]() | You can help expand this article with text translated from the corresponding article in French. (December 2022) Click [show] for important translation instructions.
|
RER NG (Class Z 58000/Z 58500) | |
---|---|
A RER NG trainset testing in Savoie | |
Stock type | Electric multiple unit |
In service | 2023–present |
Manufacturer | Alstom |
Family name | X'Trapolis |
Constructed | 2018–present |
Entered service | 13 November 2023 |
Number under construction | 255 trainsets |
Number in service | 17 |
Formation |
|
Fleet numbers | Z 58001/2 - |
Capacity |
|
Operators | SNCF |
Depots |
|
Lines served | ![]() ![]() ![]() |
Specifications | |
Car body construction | Stainless steel |
Train length |
|
Width | 2,996 mm (9 ft 10.0 in) |
Doors | 2 pairs per side, per car |
Maximum speed | 140 km/h (87 mph) |
Traction system | Alstom OniX IGBT–VVVF |
Traction motors | 16 × Alstom 4ECA 2842A 3-phase AC induction motor |
Power output | 4,000 kW (5,364 hp) (under 1,500 V DC) 5,000 kW (6,705 hp) (under 25 kV 50 Hz AC) per trainset |
Acceleration | 1.18 m/s2 (3.9 ft/s2) 6 cars 1.04 m/s2 (3.4 ft/s2)" 7 cars |
Deceleration |
|
HVAC | Refrigeration and in-train heater |
Electric system(s) | |
Current collector(s) | Pantograph |
UIC classification |
|
Braking system(s) | Electrodynamic regenerative brake |
Safety system(s) | Crocodile, KVB, CBTC (NExTEO) |
Coupling system | Scharfenberg-type, made by Dellner |
Multiple working | Within type |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
RER NG (French: RER Nouvelle Génération, English: RER New Generation), also known as the X'Trapolis Cityduplex and classified as Class Z 58000 and Class Z 58500, is a double-deck, dual-voltage electric multiple unit trainset that operates on line D and line E of the Réseau Express Régional (RER), a hybrid suburban commuter and rapid transit system serving Paris and its Île-de-France suburbs. The trainsets have gradually been introduced to service since November 2023 on line E,[1] and since December 2024 on line D.[2]
The trainsets are being built by a consortium of French manufacturer Alstom and Canadian conglomerate Bombardier. The RER NG is part of Alstom's X'Trapolis Duplex platform and is an evolution of several generations of double-deck trainsets built by the consortium, including the Z 2N, MI 2N, and MI 09 series.
Final assembly takes place at the Alstom factory in Valenciennes and the former Bombardier plant in Crespin, while the car bodies are being manufactured at the Alstom plant in Česká Lípa, Czech Republic.[1]