Zhongshanba station

Zhongshanba

中山八
Guangzhou Metro
Line 5 platform
Chinese name
Chinese中山八站
Transcriptions
Standard Mandarin
Hanyu PinyinZhōngshānbā Zhàn
Yue: Cantonese
Yale RomanizationJūngsāanbaat Jaahm
JyutpingZung1saan1baat3 Zaam6
General information
LocationNortheast side of intersection of Zhongshan 8th Road (中山八路) and Huangsha Avenue (黄沙大道), Caihong Subdistrict
Liwan District, Guangzhou, Guangdong
China
Coordinates23°07′51″N 113°13′54″E / 23.130833°N 113.231667°E / 23.130833; 113.231667
Operated byGuangzhou Metro Co. Ltd.
Line(s)     Line 5
     Line 11
Platforms4 (2 island platforms)
Tracks4
Construction
Structure typeUnderground
AccessibleYes
Other information
Station code503 1117
History
Opened28 December 2009; 15 years ago (2009-12-28)
(Line 5)
28 December 2024; 2 months ago (2024-12-28)
(Line 11)
Services
Preceding station Guangzhou Metro Following station
Tanwei
towards Jiaokou
Line 5 Xichang
Ruyifang
Outer Circle
Line 11 Caihong Bridge
Inner Circle

Zhongshanba Station (Chinese: 中山八站; Cantonese Yale: Jūngsāanbaat Jaahm), formerly Zhongshan Balu Station (中山八路站; Jūngsāan Baat Louh Jaahm; 'Sun Yat-sen 8th Road Station') during planning,[1] is a station on Line 5 of the Guangzhou Metro.[2] It is located under the junction of Zhongshan 8th Road (中山八路) and Huangsha Avenue (黄沙大道) in the commercial area of the Liwan District, near Liwan Lake (荔湾湖) and Guangzhou-Foshan Coach Terminal (广佛客运站).[3][4] Line 5 started operations on 28 December 2009.[5] Line 11 started operations on 28 December 2024.[6]

The station body of Line 11 and the Zhongshan 8th Road Transportation Hub project above it were constructed simultaneously.[7]

  1. ^ 广州地铁站以企业命名引来居民不满导致改名 (in Simplified Chinese). Archived from the original on 2011-09-27. Retrieved 2009-03-20.
  2. ^ Cite error: The named reference Line5open was invoked but never defined (see the help page).
  3. ^ 廣州地鐵五號線投標申請人報名提交資料一覽表 (in Traditional Chinese). Archived from the original on 2011-07-08.
  4. ^ 地铁五号线之中山八路站 双地铁楼市如虎添翼 (in Simplified Chinese).
  5. ^ Guangzhou Metro line Five to Open in December 2009
  6. ^ 吴多 (2024-12-27). ""环"游广州|下一站,荔湾·中山八" ["Circle" Tour of Guangzhou - Next stop, Liwan·Zhongshanba]. Guangzhou Daily (in Simplified Chinese). Archived from the original on 2025-01-02. Retrieved 2025-02-07.
  7. ^ 严艺文 (2022-07-05). "多种方式无缝换乘!广州市中山八路交通换乘枢纽预计2024年底完工" [Seamless transfers between multiple modes! Guangzhou Zhongshan 8th Road Transportation Hub is expected to be completed by the end of 2024]. Yangcheng Evening News (in Simplified Chinese). Archived from the original on 2022-07-06. Retrieved 2025-02-07.

From Wikipedia, the free encyclopedia · View on Wikipedia

Developed by Nelliwinne