Downtown MRT line


 DTL 
Downtown MRT line
Downtown MRT station, one of the 34 stations on the line.
Overview
Native nameLaluan MRT Pusat Bandar
滨海市区地铁线
டவுன்டவுன் எம்ஆர்டி வழி
StatusOperational (Stages 1, 2 & 3)
Under construction (DTL3e)
OwnerLand Transport Authority
TerminiBukit Panjang
Expo
Sungei Bedok (2024)
Stations34 (Operational) (excluding reserved station for DT4)[1]
2 (Under construction)
Service
TypeRapid transit
SystemMass Rapid Transit (Singapore)
Services1
Operator(s)SBS Transit DTL[2]
Depot(s)Gali Batu
Tai Seng
East Coast (Future)
Rolling stockC951/C951A
Daily ridership245,000 (Q1 2017)
History
Opened22 December 2013; 11 years ago (2013-12-22) (Stage 1)
27 December 2015; 9 years ago (2015-12-27) (Stage 2)
21 October 2017; 7 years ago (2017-10-21) (Stage 3)
2024; 1 year ago (2024) (Stage 3e)
Technical
Line length41.9 km (26.0 mi) (Operational)[1]
2.2 km (1.4 mi) (Under construction)
CharacterFully Underground
Track gauge1,435 mm (4 ft 8 12 in) standard gauge
Electrification750 V DC Third rail
Operating speedlimit of 80 km/h
Route map

The Downtown Line (DTL), is the fifth Mass Rapid Transport line in Singapore, the third to be completely underground, and with 3-car trains, the second medium capacity line. Currently open from Bukit Panjang to Expo. The line opened up in phases, such as Stage 1 in December 2013, Stage 2 in December 2015 and Stage 3 in October 2017. The line is colored blue on the MRT Rail map.

  1. 1.0 1.1 "Projects – Downtown Line – Stages". Land Transport Authority of Singapore. 17 December 2013. Archived from the original on 3 July 2014. Retrieved 23 June 2014.
  2. "Company Announcement – Incorporation of a Wholly-Owned Subsidiary" (PDF).

From Wikipedia, the free encyclopedia · View on Wikipedia

Developed by Nelliwinne