The Snowy Mountains scheme is a hydroelectricity and irrigation system in south-east Australia. It has sixteen major dams; seven power stations; a pumping station; and 225 kilometres of tunnels, pipelines and aqueducts. It was built between 1949 and 1974. The Chief engineer was Sir William Hudson. It is the largest engineering project in Australia.[1][2][3]