Line 27 (Chengdu Metro)

Line 27
27
Line 27 train entering Sanshengsi station
Overview
StatusIn operation
OwnerChengdu
LocaleChengdu, Sichuan
Termini
Stations23
Service
TypeRapid transit
SystemChengdu Metro
Services1
Operator(s)Chengdu Metro Limited
History
Opened19 December 2024; 2 months ago (2024-12-19)
Technical
Line length24.86 km (15.45 mi)
Number of tracks2
CharacterUnderground/Elevated
Track gauge1,435 mm (4 ft 8+12 in)

Chengdu Metro Line 27 (Chinese: 成都地铁27号线; pinyin: Chéngdū Dìtiě Èrshíqī Hào Xiàn) is a rapid transit line in Chengdu, Sichuan, China. It is a tangential line that runs diagonally from the west to the north of Chengdu. The train uses 6 car B-type trains. Line 27's colour is light blue.

On 21 August 2019, the National Development and Reform Commission approved the 4th stage of development plan from Chengdu Rail Transit, which includes Line 27.

The first phase will be from Xindu District Shifo station to Qingyang District Shuxin Road station. The line is 24.86 km long with 23 stations. From the north, the line has a 7.52 km long elevated section with 6 stations, followed by a 17.34 km underground section with 17 stations. Phase 1 started construction on 18 May 2020,[1][2] and is opened on 19 December 2024.[3]

  1. ^ "成都市轨道交通(2019-2035)最新规划之地铁27号线最全解析篇" (in Chinese). 2020-06-08.
  2. ^ "@成都城北市民:地铁27号线(一期)全线打围施工_四川在线". sichuan.scol.com.cn (in Chinese). Retrieved 2021-03-13.
  3. ^ "定了!12月19日,8号线二期、27号线一期开通!". 18 December 2024.

From Wikipedia, the free encyclopedia · View on Wikipedia

Developed by Nelliwinne