Line 6 | |||
---|---|---|---|
![]() | |||
![]() | |||
Overview | |||
Status | Operational | ||
Owner | Wuhan | ||
Locale | Wuhan, Hubei | ||
Termini | |||
Stations | 32 | ||
Service | |||
Type | Rapid transit | ||
System | Wuhan Metro | ||
Services | 1 | ||
Operator(s) | Wuhan Metro Group Co., Ltd. | ||
Rolling stock | CRRC Zhuzhou Locomotive Chinese Type A | ||
History | |||
Opened | 28 December 2016 | ||
Technical | |||
Line length | 42.537 km (26.43 mi) | ||
Number of tracks | 2 | ||
Character | Underground | ||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) | ||
|
Line 6 of the Wuhan Metro was opened on 28 December 2016. It is the fifth line of the Wuhan Metro to be opened since its creation.[1] A 7-km extension to the line opened on 26 December 2021.[2]
The northern end of the line is Xincheng 11th Road station in Dongxihu District. The southern end of the line is Dongfeng Motor Corporation station in Caidian District.