![]() | You can help expand this article with text translated from the corresponding article in Japanese. (February 2012) Click [show] for important translation instructions.
|
Tokyo Gate Bridge 東京ゲートブリッジ | |
---|---|
![]() Tokyo Gate Bridge, January 2015 | |
Coordinates | 35°36′41″N 139°49′38″E / 35.61139°N 139.82722°E |
Carries | Road traffic (4 lanes), pedestrians |
Crosses | Tokyo Bay |
Locale | Kōtō City (Tokyo, Japan), between Chubo and Wakasu artificial islands) |
Characteristics | |
Design | cantilever bridge |
Total length | 2,618 metres (8,589 ft) including approaches |
Width | 21 metres (69 ft) |
Height | 87.8 metres (288 ft) |
Longest span | 440 metres (1,440 ft) |
No. of spans | 3 |
Clearance below | 54.6 metres (179 ft) |
History | |
Construction start | 2002 |
Construction end | 2011 |
Opened | 2012 |
Statistics | |
Toll | None |
Location | |
![]() |
Tokyo Gate Bridge (東京ゲートブリッジ, Tōkyō Gēto Burijji) is a truss cantilever bridge across Tokyo Bay in Kōtō, Tokyo, Japan. It opened on 12 February 2012[1][2] with an estimated total construction cost of 113 billion yen for the Stage II section of highway including the bridge.[3]